BCT have added the Boeing 747-8 Intercontinental and Freighter aircraft to our Part 145 Approval (cert to follow later this week)
BCT have signed a contract to support Biman Airlines at London Heathrow
BCT have signed a contract with GSS to support their Boeing 747-8F operation at Dhaka for British Airways World cargo
BCT have signed a contract to support Air Moldova at Gatwick Airport
BCT to open new line station in Cardiff from Jan 20th 2012 for an on going contract with Thomas Cook Airlines
BCT open new line station at Sabiha Gökçen International Airport.
BCT open new line station at Edinburgh Airport.
Find out more about: Line Stations
BCT's base maintenance approval allows us to accommodate more complex maintenance tasks that are beyond the scope of most line maintenance organisations.
Our base maintenance approval backs up our line maintenance during AOG situations for tasks such as structure repairs or major component change. It also allows us to accommodate bigger scheduled maintenance tasks such as Hangar A checks, repairs, engine/APU/landing gear changes and modification that are beyond the scope of most line maintenance organisations.
This capability is further aided by our comprehensive inventory of tooling and equipment ranging from engine change kits, full range & automatic pitot static testers, video borescope kits, mobile workshop/stores with a tool control system that we use for large away from base workpackages.
Copyright 2010 BCT AVIATION MAINTENANCE Ltd. REF2008500738 ---- Powered by JOOMLA! V1.5 & K2 ---- Site by METADIV.CO.UK 